Catégories
Nouveau Blog
Standard Operating Procedure for L-900 Splicing Machine
Jun 25, 2025I. Power-On Preparation
1. Connect the dedicated device battery
2. Check air pressure (0.4-0.6MPa)
3. Prepare materials (confirm tape width: 8-24mm)
II. Device Startup
1. Turn on the main power switch
2. Wait for system self-test to complete (~15 seconds)
3. Operator login (manually enter username and password)
III. Loading & Splicing Operation
1. Click the Start button
2. Place new/old tapes at both ends of the rail
3. The splicer automatically performs positioning recognition, measurement, and cuts the tested material
4. Automatically splices left/right tapes (film positioning accuracy up to ±0.2mm)
IV. Unloading Operation
1. Remove the spliced tape and place it at the feed roller position (completed tape auto-ejects)
2. Press the Unload button to collect the tape (place on take-up reel)
3. Splicing completed
V. Shutdown Procedure
1. Clean the work area (remove tape residues)
2. Turn off the main power
Notes:
- Emergency stop: Press the red emergency button
- Error codes: Refer to Chapter 7 in the manual
- Regular maintenance: Lubricate rails weekly
Technical Support Hotline:18124172940 (24/7)
Youngpool Technology – Making Electronics Manufacturing Simpler